Skip to content
ARGO GOLD INC. CSE:ARQ (C$) Loading...  OTC: ARBTF FRANKFURT: A2ASDS

RESOURCE PORTFOLIO

Hurdman Silver-
Zinc Project

Silver–zinc mineralization with associated gold mineralization

PROJECT FACTS

Commodity
Silver / Zinc / Gold
Location
Ontario
Company
Argo Gold Inc.

Project Profile

Silver–zinc mineralization with associated gold mineralization

Approximately 120 km north of Timmins, the Hurdman project combines historically drilled mineralization with additional structural and electromagnetic targets.

60km2
April 2026 Land package
120km
North of Timmins
450m
Mineralized Strike

Ag-Zn-Au

Commodities

GEOLOGY & PROJECT INFORMATION

Technical Overview

Explore the property setting, exploration history and project results.

On February 19, 2026, Argo reported an agreement to acquire a 100% interest in mineral claims comprising an initial 2,474-hectare property. The company subsequently reported staking an additional approximately 35 km² and described a total land package of about 60 km² in April 2026.

The February acquisition agreement described consideration of 1,250,000 common shares at a deemed price of CAD $0.125 per share and a small net-smelter-returns royalty. Those terms are from the dated announcement.

The property is situated near the contact of the Quetico Metasedimentary Belt and Kapuskasing Structural Zone. Historical descriptions discuss a zinc–silver-bearing Hurdman Sulphide Zone, with sulphides ranging from disseminated through semi-massive and massive occurrences.

The main mineralized trend was described over approximately 450 metres of strike, with a shallow northward dip of about 15–25 degrees and mineralization within 150 metres of surface. Historical drill widths range from roughly 1 to 38 metres true thickness.

An interval returned 3.0% zinc and 12.1 g/t silver over 23.6 metres; selected gold intersections included 48.7 g/t over 0.5 metres and 2.5 g/t over 4.1 metres.

The modern project overview also cites a drill-hole interval ELO-06-12 with 10.37% Zn, 57.68 g/t Ag and 1.37 g/t Au across the interval from 39.2 to 41.4 metres. The figures represent selected historical work and should not be interpreted as a current resource estimate.

The project incorporates a set of airborne electromagnetic (VTEM) anomalies, a main sulphide zone and an eastern mineralized target about 1.5 km from the principal zone. The known structural and conductor trend extends beyond areas drilled historically.

Historical campaigns by earlier operators included 53 diamond-drill holes totalling approximately 7,444 metres, together with geological and geophysical surveys. The map gallery identifies original Argo Gold technical exhibits by project.

he February 2026 acquisition announcement states that technical information was reviewed and approved by Michael Guo, a Qualified Person under National Instrument 43-101. Historical results are source-specific and not necessarily predictive of additional discoveries.

Project Location Maps

Hurdman Map in Ontario
Hurdman Map in Ontario
Ontario Map with TImmins and Hurdman Project with map detail box
Hurdman Property map-showing location with Road networks
Hurdman Map in OntarioOntario Map with TImmins and Hurdman Project with map detail boxHurdman Property map-showing location with Road networks

Click on thumbnails to view different Talbot Lake maps. Click on larger map to view full-size map in the Lightbox viewer,

Project Geology Maps

Hurdman Claims Map-Argo Gold
Hurdman Claims Map-Argo Gold
Map 1: Hurdman Silver Zinc Project Mineral Claims and VTEM conductors
Hurdman Claims Map-Argo GoldMap 1: Hurdman Silver Zinc Project Mineral Claims and VTEM conductors

Click on thumbnails to view different Talbot Lake maps. Click on larger map to view full-size map in the Lightbox viewer,

National Instrument 43-101 Disclosure

The technical information in this news release has been reviewed and approved by Michael Guo, who is a “Qualified Person” as defined in National Instrument 43-101. Historical geochemical, drilling results and geological descriptions quoted in this news release are from historical data, previous news releases, a technical report on Hurdman dated March 2018, and from information provided by the Government of Ontario.  Management cautions that historical results or discoveries on adjacent or nearby mineral properties are not necessarily indicative of the results that may be achieved on Argo’s mineral properties.

Project Geology Description

Fifty three diamond-drill holes, comprising 7444 m, were completed; a total of 1955 altered/mineralized samples were collected from 51 drill cores and submitted for assay. In addition, 120 samples were collected (2005 and 2008 cores) and submitted for whole rock analysis, and 189 pulps from the 2006 and 2007 drilling were re-assayed for lead in 2008. As a result of Eloro’s work, it has been confirmed that:

  • The zinc-silver mineralization of the Main Hurdman Sulfide Zone (HSZ) is spatially associated with and mostly peripheral to pyrrhotite-pyrite lodes and pegmatite sills, which are within an alteration envelope of pale grey, sillimanite-bearing rocks that contain disseminated and “blebby” sphalerite;
  • The east-west extent of the Main HSZ is at least 350 m and its north-south extent is at least 300 m; the top of the altered/mineralized envelop is close to surface (beneath glacial deposits) in the most southern holes but it is below 100 m vertical depth in the most northern holes, indicating a shallow dip to the north;
  • The thickness of the altered/mineralized envelope is variable; drill intersections range from 2 to 50 m but generally exceed 5 m;
  • Zinc and silver grades in the Main HSZ range from 1.45% to 13.8% Zn and from 2.55 g/t to 166 g/t Ag over widths ranging from 0.5 to 28.2 m; elevated gold values (> 1 g/t Au) are erratic but range from 1.15 to 48.69 m over drill widths ranging from 0.4 to 7.9 m;
  • Within the altered/mineralized envelope, there is a corridor that varies between 1.9 m and 19.95 m in apparent thickness, which contains zinc values > 2 % and silver values > 15 g/t.
  • A new zone, the East HSZ, occurs approximately 1.5 km east of the main zone and it dips gently to the northeast; its extent is unknown but drill intersections of the altered/mineralized envelope are not as thick (< 10 m) as those in the Main HSZ; McCutcheon Geo-Consulting Hurdman 2011
  • Zinc and silver grades in the east zone range from 0.5% to 4.94% Zn and from 6 g/t to 266 g/t Ag over widths ranging from 0.4 to 9.8 m; gold values are all < 1 g/t Au;
  • The Main and East zones are encompassed by a “geophysical domain” that consists of clusters of point and linear VTEM anomalies;
  • There are 5 geophysical domains (D-01 to D-05) and 6 separate VTEM linears (L-01 to L-06) on the Property; the 3 km by 1 km D-04 domain is associated with the HSZ;
  • These domains form a horseshoe-shaped pattern that may reflect a large-scale fold in the central part of the Property; the HSZ is at the southeastern end of this horseshoe; and
  • Northerly trending magnetic anomalies (at least seven) reflect late-stage dike rocks that cut across this horseshoe. The author believes that the altered mineralized zone at Hurdman represents a melting (anatectic) front in high-grade metamorphic rocks, rather than a primary alteration zone associated with a Sedex or VMS-type massive sulphide deposit.

CORPORATE MILESTONES

Project history

2005-2008
Agreement to acquire the Hurdman claims
February 2026
Agreement to acquire the Hurdman claims
April 2026
Additional claims staked; about 60 km² reported
Back To Top